Purchase of storage facility Soliver

Challenge

Soliver, based in Waregem, manufacturers of double glazing, had a structural need for extra storage capacity for racks of their finished products.

Solution

The company opted to purchase a robust storage facility made by Veldeman as this structure is solid and sustainable and therefore ideally suited for this permanent application. The storage facility is 20 metres wide, 40 metres long and the side walls are 4 metres high. The side walls are made of single-wall steel cladding. The roof includes a high-quality PVC inner layer to prevent condensation. Electrically operated sectional folding doors are centrally located at both ends of the storage facility and these are 5 metres by 5 metres. A staff entry door is also included. The storage facility was erected at the entrance to an existing building, next door to an electrical substation. A neat job, made to measure!